Assemble and Installation Guide of HD Single girder Overhead Crane
Check the Components List
Bridge Installation:
End Carriage Installation
Remove the hand hole cover
Install the retaining bolts
Install the bolts
Install the anti-loosening nut
Install the hand hole cover
Install the buffers of girders
Install the buffers of trolley frame
Prepare installation of festoon C track Bracket
Installation of festoon C track Bracket
Tighten the C track bracket bolts
Install the cable carrier
Install the cable channel
Install the C track joints
Tighten the cable carrier bolts
Install the cable Hanging clips
Install the wireframe base
Install the wireframe
Install the crane electric box
Install the remote controller
Install the cable trolley
Install the cable
Fasten the cable end carrier
Cable set up
Bundling
Wiring
Install the crane limiter
Electric Hoist Installation:
Loosen the screw nut
Unscrew the drive shaft screw
Loosen the friction ring screw
Cut the bandage
Adjusting the space of the trolleys
Make sure the spacing is greater than the width of the girder bottom plate
Place the hoist in the installation location
Adjust the distance by tightening the nut to ensure that the distance between the trolley wheel edge and the trolley runway is 3-5mm
Tightening screw nut and anti-loosening nut
Tighten the friction ring screws
Tighten the drive shaft screws
Install the conductive bracket
Connect the aviation plug
Add anti-slip lock
Power on to debug the motion and run the drive device
Note: Please follow the correct operation method to avoid danger